« Return to results |
|
|
Date Posted: |
06/01/2010 |
Submission Title |
Summary of Mousam Lake Septic System Study |
Author(s) |
JBR Consulting Hydrologist |
Year Created |
1996 |
Resource Type |
Publications, Websites, and Tools |
Publisher |
JBR Consulting Hydrologist |
Media Type |
Report (unpublished) |
Volume, Issue, pp |
2pp |
|
|
Abstract/Description |
|
In August 1994, JBR consulting Hydrologist (JBR) submitted a 604b grant proposal to the Maine Department of Environmental Protection on behalf of the Mousam Lake Association to evaluate the impacts of septic systems on lake water quality.
|
URL |
|
|
|
Theme>Topic |
Water Quality > Water Treatment Water Quality > Ponds and Lakes |
Location |
|
|
|
Attachment |
Mousam Lake Septic Sum.pdf |
|